No effectiveness test calculation possible. Eff. test must be uploaded
Message type: E = Error
Message class: TPM_THX1 - Treasury: Message Class for P-HA
Message number: 389
Message text: No effectiveness test calculation possible. Eff. test must be uploaded
Self-Explanatory Message
SAP has defined this message as ‘self-explanatory’ and therefore, has not provided any further details for it.
All messages in SAP have a message text (shown above). However, the message text is not always useful enough to understand or resolve the issue.
Therefore, most messages in the SAP system provide additional long text with details about what caused the issue, how it can be resolved, what actions to take or configuration changes to make, etc
Unfortunately, this specific error message does not provide such additional information.
What else can you do?
Even though this error message does not provide any useful or additional message details, you can still try to solve the issue by searching on SAP’s support portal. In many cases, there could be an SAP support note that provides further error explanations or even directions for resolving the error.
Related Error Messages
TPM_THX1388 Fixed interest bonds are not supported in scenario 710.
TPM_THX1387 Variable interest bonds are not supported in scenario 150 and 151
TPM_THX1390 No effectiveness test upload possible. Eff. test must be calculated
TPM_THX1391 Only Prosp.Eff.Test. will be calculated. Retrosp.Eff.Test to be uploaded