Resource &1: increase capacity overload is not taken into account
Message type: E = Error
Message class: /SAPAPO/SNPOPT - Optimizer Messages
Message number: 045
Message text: Resource &1: increase capacity overload is not taken into account
What causes this issue?
The increase capacity of resource &V1& is being loaded with more than
its available capacity between bucket &V2& and bucket &V3& through
other infinite planning methods.
System Response
The increase capacity available for the current optimizer planning run
is less than zero. The linear problem cannot be solved. Therefore, the
optimizer increases the capacity available in these buckets to 0.
How to fix this error?
If the overload at the resource is acceptable, no action is required.
If not, reduce the fixed orders causing the overload (the PP/DS
production orders or PP/DS stock transfer orders), until there is no
longer an overload at the resource.
Error message extract from SAP system. Copyright SAP SE.
Related Error Messages
/SAPAPO/SNPOPT044 Resource &1: Not available or has no available capacity
/SAPAPO/SNPOPT043 Resource &1: Overload not taken into account
/SAPAPO/SNPOPT046 Resource &1: No available capacity in time frame &2 to &3
/SAPAPO/SNPOPT049 Transportation resource &1: The capacity is not valid