Resource &1: increase capacity overload is not taken into account

Message type: E = Error

Message class: /SAPAPO/SNPOPT - Optimizer Messages

Message number: 045

Message text: Resource &1: increase capacity overload is not taken into account



What causes this issue?

The increase capacity of resource &V1& is being loaded with more than
its available capacity between bucket &V2& and bucket &V3& through
other infinite planning methods.


System Response

The increase capacity available for the current optimizer planning run
is less than zero. The linear problem cannot be solved. Therefore, the


optimizer increases the capacity available in these buckets to 0.


How to fix this error?

If the overload at the resource is acceptable, no action is required.
If not, reduce the fixed orders causing the overload (the PP/DS
production orders or PP/DS stock transfer orders), until there is no
longer an overload at the resource.