Invalid reference calendar
Message type: E = Error
Message class: /SAPAPO/SEQ - Message Sequencing
Message number: 520
Message text: Invalid reference calendar
What causes this issue?
The reference calendar for the selected procedure package is blank or
is not maintained for shifts or does not cover the complete planning
horizon.
System Response
The system terminates the planning run.
How to fix this error?
In Customizing, under
,,,,APO -> Master Data -> Calendar ->
<DS:TRAN./SAPAPO/CALENDAR>Maintain Planning Calendar (Time Stream)</>,
maintain a planning calendar with a calculation rule that is defined
for shifts. Make sure that the calendar extends long enough into the
future.
Procedure for System Administrators
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.