Duration of PPM/PDS &1 is too long

Message type: E = Error

Message class: /SAPAPO/PP_OPTIMIZER - Optimizer Messages

Message number: 236

Message text: Duration of PPM/PDS &1 is too long



What causes this issue?

The production process model (PPM) or the production data structure
(PDS) &V1& uses a resource &V2& for sequence-dependent lot-size
planning. The gross duration exceeds the length of period &V3&.


System Response

The optimization run is canceled.


How to fix this error?

Use a time bucket profile with longer periods, so that the PPM or PDS
can be scheduled without being cross-period.


Procedure for System Administrators

The system issues an error message and will not allow you to continue with this transaction until the error is resolved.