Depreciation of PR sched. line exceeds allowed value (&1/&2/&3)
Message type: E = Error
Message class: /SAPAPO/PDRP_APPR - DRP Release Process Messages
Message number: 080
Message text: Depreciation of PR sched. line exceeds allowed value (&1/&2/&3)
What causes this issue?
Management approval: The quantity specification of a schedule line was
reduced and the new value is greater that the maximum value allowed
for quantity reduction (quantity &V4&%).
Document category scheduling agreement item, document number: &V1&,
document item: &V2&, schedule line &V3&
System Response
The document is forwarded to the responsible processor to be approved in
line with management approval.
How to fix this error?
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Procedure for System Administrators
Error message extract from SAP system. Copyright SAP SE.
Related Error Messages
/SAPAPO/PDRP_APPR079 Depreciation of SA sched. line falls below allowed value (&1/&2/&3)
/SAPAPO/PDRP_APPR078 No entry for product &1 in found in interchangeability group &2
/SAPAPO/PDRP_APPR081 Depreciation of PO schedule line exceeds allowed value (&1/&2/&3)
/SAPAPO/PDRP_APPR082 No documents relevant to selection could be found