Max. partner horizon (9999 days) exceeded for product &1
Message type: E = Error
Message class: /SAPAPO/OO_TR - Messages in Development Class OO_TR
Message number: 474
Message text: Max. partner horizon (9999 days) exceeded for product &1
Self-Explanatory Message
SAP has defined this message as ‘self-explanatory’ and therefore, has not provided any further details for it.
All messages in SAP have a message text (shown above). However, the message text is not always useful enough to understand or resolve the issue.
Therefore, most messages in the SAP system provide additional long text with details about what caused the issue, how it can be resolved, what actions to take or configuration changes to make, etc
Unfortunately, this specific error message does not provide such additional information.
What else can you do?
Even though this error message does not provide any useful or additional message details, you can still try to solve the issue by searching on SAP’s support portal. In many cases, there could be an SAP support note that provides further error explanations or even directions for resolving the error.
Related Error Messages
/SAPAPO/OO_TR473 Period was set to maximum value of 9999 days
/SAPAPO/OO_TR472 Max. planning horizon (9999 days) exceeded for product &1
/SAPAPO/OO_TR475 Max. lead time push exceeded for means of transport &1 (<400.000 h)
/SAPAPO/OO_TR476 Max. lead time pull exceeded for means of transport &1 (<400.000 h)