Multiple entries refer to strategy &1; ensure unique assignment
Message type: E = Error
Message class: /SAPAPO/LOC - Location: Message Class
Message number: 246
Message text: Multiple entries refer to strategy &1; ensure unique assignment
What causes this issue?
The control strategy &V1& has been assigned to multiple geocoding levels
(GC levels). You cannot make multiple assignments for new entries. Each
control strategy must have a unique mapping to a GC level. For existing
entries, ambiguous assignments are not prohibited (only a warning
message is issued), but we recommend to avoid them.
System Response
The system accepts ambiguous assignments among existing GC levels for
compatibility reasons. However, a control strategy that has been
assigned to multiple GC levels might cover unnecessary space in the
database and could slow the system performance down.
How to fix this error?
Enter a control strategy that has not yet been assigned to a GC level.
&HINWEIS&: If all known control strategies have already been assigned to
a GC level, you must define and assign a new control strategy before you
can save the new GC level.
Procedure for System Administrators
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.