Cost summation cannot be carried out for oil BoM header item &
Message type: E = Error
Message class: O3 - IS-Oil: HPM messages (goods movements, QCI, deliveries)
Message number: 174
Message text: Cost summation cannot be carried out for oil BoM header item &
What causes this issue?
For an oil BoM header, the costs are determined by summing up the costs
of the subitems. However, the item currently processed has no subitems.
System Response
The cost condition is set to "inactive" and the billing document cannot
be released.
How to fix this error?
The preceeding goods issue document has to be cancelled and subitem(s)
have to be maintained in sales order or delivery.
Procedure for System Administrators
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
Related Error Messages
O3173 Combination TDP/Oil BOM header and HPM/Oil BOM components not allowed
O3172 Oil BOM header material has to be either a TDP or HPM material
O3175 Enter density type before assigning a unit of measure to conversion group
O3176 Incorrect dimension: enter a dimensionless unit of measure