Level for cost overrun does not correspond to valuation level
Message type: E = Error
Message class: KQ - Error Messages for Customizing Product Costing
Message number: 134
Message text: Level for cost overrun does not correspond to valuation level
What causes this issue?
One of the following situations has occurred:
Through the valuation level you specified that you want to valuate at
totals level (per order or project). However, you selected a method for
dealing with the plan overrun (actual costs exceeding planned costs)
that replaces the planned values with the actual values for each
<DS:GLOS.line_ID>line ID</>. This combination is not possible.
Through the valuation level you specified that you want to valuate each
line ID separately. However, you selected a method for dealing with the
plan overrun (actual costs exceeding planned costs) that replaces the
planned values with the actual values at totals level. This combination
is not possible.
System Response
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
How to fix this error?
Correct your entries as follows:
If you have used the valuation level to define that you want to valuate
at totals level, choose a method of handling the overrun that is made
at totals level.
If you have used the valuation level to define that you want to valuate
at line ID level, choose a method of handling the overrun that is made
at line ID level.
Error message extract from SAP system. Copyright SAP SE.