Start the detail plan in the Portal or NWBC. (See long text)
Message type: E = Error
Message class: HRHCP00_PLAN - Messages About Personnel Cost Plan
Message number: 200
Message text: Start the detail plan in the Portal or NWBC. (See long text)
What causes this issue?
Business function <LS>HCM, Personnel Cost Planning and Simulation
(HCM_HCP_CI_1) </> is active.
System Response
In this case, the detail plan can no longer be launched from the back
end. Instead, it must be launched from <LS>SAP Enterprise Portal
(Portal)</> or <LS>NetWeaver Business Client (NWBC)</>.
How to fix this error?
Managers find the detail plan in one of the following places:
In the <LS>Portal</> under <LS>Manager Self-Service -> Overview ->
Personnel Cost Planning</>
In <LS>NWBC</> under <LS>Manager Self-Service -> Team -> Services ->
Personnel Cost Planning</>.
Procedure for System Administrators
A role must first be created for administrators of Personnel Cost
Planning with enhanced authorization (model role: <LS>
SAP_HR_CPS_DET_PLAN_C_SR_NWBC</>).
An iView (Portal) or service (NWBC) with the following parameters is
required:
Application: <LS>WDA_HCP_DET_PLAN_C </>
Application Configuration: <LS>WDA_HCP_DET_PLAN_C_AC</>
For authorizations, refer to model role <LS>
SAP_HR_CPS_DET_PLAN_C_SR_NWBC </>.
Error message extract from SAP system. Copyright SAP SE.
Related Error Messages
HRHCP00_PLAN160 Error creating documents in cost projection &1: no documents created
HRHCP00_PLAN155 Change date (&1) must lie after validity end date &2
HRHCP00_PLAN201 Cancel "&1": &2 of &3 events could not be canceled
HRHCP00_PLAN202 The change date (&1) cannot be before the start of validity period &2