Leading POB &1 cannot be added to compound group
Message type: E = Error
Message class: FARR_PROCESS_CHECK - Messages for Input Checks in Process Layer
Message number: 082
Message text: Leading POB &1 cannot be added to compound group
What causes this issue?
The system tried to move a leading POB into a compound group. This is
not supported.
This could happen when a POB was created with linked POBs and later the
BRF+ configuration was changed so that this leading POB is now assigned
to a compound group.
System Response
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
How to fix this error?
Please check BRF+ settings for decision tables DT_PROCESS_COMPOUND and
DT_PROCESS_POB_ADD. It is not possible to add a POB to a compound group
if it was previously created with linked POBs.
To enable the compound group changes on this contract you may delete the
linked POBs in a first step by removing the configuration for linked POB
and compound group in BRF+ for the leading POB and then processing the
Revenue Accounting Items again. Afterwards you can add the compound
group configuration in BRF+ again and trigger a new set of Revenue
Accounting Items by making a change in the operational document.
Note that if you make such changes in BRF+ these will affect all
contracts in case there are any changes from the source system.
Procedure for System Administrators
Error message extract from SAP system. Copyright SAP SE.
Related Error Messages
FARR_PROCESS_CHECK081 Non-distinct POB &1 in time-based compound group: must be time-based
FARR_PROCESS_CHECK080 Non-distinct POB &1 in PoC compound group must be PoC or event-based
FARR_PROCESS_CHECK083 Compound group POB &1 contains less than two non-distinct POBs
FARR_PROCESS_CHECK084 Compound group POB &1 cannot be a leading or linked POB