Inconsistency between current date and date of last report export
Message type: E = Error
Message class: DV - EHS: Messages for Report Shipping
Message number: 552
Message text: Inconsistency between current date and date of last report export
What causes this issue?
An inconsistency occurred between the current date and the date of the
last report export:
Current date: &V1&
Last export: &V2&
The following scenarios may occur:
If the last export date is the same as the current date, the report
export will have been carried out by the current date.
If the last export date is in the future, the environment parameter
<LS>RE_LAST_EXPORT</> that contains the date of the last report export
is filled manually with an invalid value.
System Response
Report export was not carried out.
How to fix this error?
In Customizing, check the environment parameter <LS>RE_LAST_EXPORT</>.
Error message extract from SAP system. Copyright SAP SE.