Mat. & in plant & should be costed in cost est. w/o qty structure

Message type: E = Error

Message class: CK - Product Costing Messages

Message number: 350

Message text: Mat. & in plant & should be costed in cost est. w/o qty structure



What causes this issue?

The <DS:DE.CK_EKALREL>With quantity structure</> indicator in the
costing view of the master record of material &V1& in plant &V2& is not
set. The material is normally costed with a
<DS:GLOS.cost_estimate_without_quantity_structure>cost estimate without
quantity structure</>.


System Response

The system costs the material anyway, using a
<DS:GLOS.cost_estimate_with_quantity_structure>cost estimate with
quantity structure</> (that is, using any BOMs and routings that may be
present in the system).


How to fix this error?

If you normally want to cost the material using BOMs and routings, set
the <LS>With quantity structure</> indicator in the costing view of the
material's master record.

Error message extract from SAP system. Copyright SAP SE.