Item &1 is assigned with both F and C ARun status; Refer the Long Text.
Message type: E = Error
Message class: ARUN_MAIN -
Message number: 149
Message text: Item &1 is assigned with both F and C ARun status; Refer the Long Text.
What causes this issue?
Document item is relevant for Supply Assignment (ARun).
Document item has assignments in both Ready for Delivery (F) and IFO
Assignment (C) ARun status; Outbound delivery can be created for the
quantities in Ready for Delivery(F) ARun status only.
IFO Assignment quantity will be considered for delivery creation after
Ready to Delivery quantity is fully consumed.
System Response
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
How to fix this error?
Create Outbound delivery for the same document item to deliver the
remaining quantities with IFO Assignment (C) ARun Status.
Procedure for System Administrators
Error message extract from SAP system. Copyright SAP SE.
Related Error Messages
ARUN_MAIN148 Full delivery can't be created for item &1 with multiple IFO Assignments
ARUN_MAIN147 Quantity reverted for ARun relevant BOM components of header for item &1.
ARUN_MAIN150 Record &1. Item has been assigned completely.
ARUN_MAIN151 Record &1. Item has been partially assigned with Quantity: &2.