Actual cost distribution on construction measure incomplete
Message type: E = Error
Message class: 6A - Real estate messages rent adjustment
Message number: 553
Message text: Actual cost distribution on construction measure incomplete
What causes this issue?
You want to carry out a rent adjustment as a result of a construction
measure. There are two ways of determining how the total costs of the
work are distributed between the participating rental units.
Indirectly via an apportionment factor (such as "living area")
Directly by detailing the costs on the rental units
In this particular case you have entered an apportionment unit as well
as maintaining the cost distribution in the master data of the
construction measure.
System Response
The system takes account of the apportionment unit and ignores the cost
distribution details for the construction measure.
How to fix this error?
If you want to carry out the cost distribution according to the data
entered for the construction measure, leave the "apportionment unit"
field empty.
Error message extract from SAP system. Copyright SAP SE.
Related Error Messages
6A552 Enter apportionment unit or maintain actual cost distribution
6A551 Cost distribution acc.to apportionment unit; Constr.work values ignored
6A554 Enter apportionment unit or maintain planned cost distribution
6A555 Planned cost distribution on construction measure incomplete